QUALITY & EVIDENCE

Verified documents. Clear scope. Practical inspection.

Review management-system certificates and selected product evidence together with the project checks used before delivery.

HOW TO READ THIS PAGE

A certificate only supports the product, model, component, directive, standard and validity period stated on that document.

Final compliance depends on the destination market, selected configuration and current project documentation. Ask SEPPES for the document set that applies to your ordered model.

VERIFIED DOCUMENTS

Current evidence available for review

ISO 9001:2015 Quality Management certificate

25025Q13105R0M

ISO 9001:2015 Quality Management

Issued 28 Sep 2025 · expires 27 Sep 2028Intelligent control system integration services; production, development and sales, including export, of industrial metal doors and logistics loading/unloading equipment.
ISO 14001:2015 Environmental Management certificate

25025E00038R001

ISO 14001:2015 Environmental Management

Issued 25 Dec 2025 · expires 24 Dec 2028The certified management-system scope shown on the certificate covers the stated industrial door and logistics-equipment activities.
ISO 45001:2018 Occupational Health & Safety certificate

25025S00029R001

ISO 45001:2018 Occupational Health & Safety

Issued 25 Dec 2025 · expires 24 Dec 2028The certified management-system scope shown on the certificate covers the stated industrial door and logistics-equipment activities.
High-Speed Door CE Documentation certificate

Certificate 8604868

High-Speed Door CE Documentation

Issued 23 Apr 2025 · valid until 22 Apr 2030Applies to the models listed on the document: SE-KSM-075, SE-LLM-1000, SE-LKKSM-L200, SE-YKM-G1000 and SE-TSM-660; standards stated include EN ISO 12100:2010 and EN 60204-1:2018.
Industrial Door Operator TÜV EMC certificate

AE 50746884 0001

Industrial Door Operator TÜV EMC

Document dated 9 Sep 2026EMC Directive 2014/30/EU conformity for Power Door Drive types SE80-750 and SE100-1500. This scope applies to the listed operator models, not automatically to every complete door.
PVC Component UL Compliance certificate

E537115

PVC Component UL Compliance

Document dated 22 Nov 2023Applies to the PVC plastics component REF100 identified in the certificate. It must not be interpreted as UL certification of every complete door system.

PROJECT QUALITY PATH

From requirements to shipment release

01

Requirement review

Opening, environment, traffic, controls and evidence requirements are recorded before configuration.

02

Technical confirmation

Drawings, interfaces, selected options and supply boundaries are confirmed for the project.

03

Inspection and function checks

The agreed door functions, safety devices, identification and documentation are checked before release.

04

Protected delivery

Packing, manuals and project documents are prepared for the agreed export and installation scope.

Need evidence for a tender or market?

Send the product, model, destination country, project standard and required document list. We will confirm what evidence applies before you rely on it.

Request applicable documents

Prepare your inquiry

Discuss Your Industrial Door Project

Send the details you already have and identify the decisions that are still open.

Continue on WhatsApp

Fields marked * are required. Your inquiry will be sent directly to our sales team. Read our Privacy Policy.